logo
Finwire

Finwire

Akobo Minerals produced 12 kilos of gold in October – resumes exploration drilling

Gold producer Akobo Minerals produced approximately 12 kilos of doré gold at the Segele mine in Ethiopia during October, with an average processed gold grade of 11 grams per tonne. Total production since operations began thus amounts to approximately 181 kilos, with an average grade of 22 grams per tonne.

The lower gold grade in October was mainly explained by a larger proportion of low-grade material from mine development and previously processed material.

Development of the vertical mine shaft is continuing despite challenging ground conditions. The company is expected to present an updated mine plan in December. Mining operations could potentially be expanded to a depth of approximately 200 metres.

Drilling has resumed at the Gingibil exploration area. The first two drill holes intersected the targeted quartz vein, with visible gold in both. Further drilling and laboratory analyses are required to assess the potential of the discovery.

Share this post

Verifierad av MonsterInsights